EXPERIENCE
Hendrikus's Projects
Every day, we are committed to help our clients make the impossible possible. We have extracted our key projects of the last sixty years. Read more about these projects here.


Offshore wind
He Dreiht
The installation of the 64 WTG Monopiles and Transition Pieces.


Offshore decommissioning
Sable Project
48,000 metric tons of infrastructure removed with zero recordable HSE cases.
%20low%20resa3e2.jpg?width=2400&name=sleipnir%20installing%20leviathan%20platform%20(1)%20low%20resad34.jpg)
%20low%20resad34.jpg?width=1800&name=sleipnir%20installing%20leviathan%20platform%20(1)%20low%20resad34.jpg)
Offshore transport and installation
Leviathan
Installing the Leviathan platform, with Sleipnir's first project being the record-breaking 15,300 topside installation.
Hendrikus Marine Contractors projects


Hendrikus Fabrication
Golden Eagle
Fabricating two 6,500 metric ton jackets at the Hendrikus Fabrication Group yard in Amsterdam in only eighteen months
Hendrikus Fabrication Group projects
Hendrikus Steel & Metal Fabricators projects

Are you ready to make waves?
Join the Hendrikus team!